Tower Bridge, London

The Eccles Engineering team were approached by the City of London to offer a bespoke solution for replacing some of the older pedestrian walkway covers on one of the world’s most famous bridges.
Llandudno Flyover, Wales

Fast, bespoke drainage solution for prestigious Welsh bridge as Eccles work with MWT Civil Engineering on the LLandudno Flyover refurbishments.
Desborough Railway Bridge

AquaDeck units developed, fabricated and delivered to site at the A6 Desborough Railway Bridge – all in just five days – as we respond quickly to maintenance works scheme.
Great Yarmouth’s Third Crossing

We are pleased to announce that AquaDeck has been selected to drain Great Yarmouth’s new third crossing bridge in Norfolk.
Perry Barr Bus Depot

The Eccles Special Products Division designs and manufactures specially fabricated access gratings for the engine and chassis wash down areas at Perry Bar Bus Depot.
Dyfi Bridge, Wales

AqauDeck has been chosen to drain the new 725m viaduct at Dyfi Bridge, Wales, as part of a £46m improvement project to calm traffic, improve transport links and ease flooding in the area.
Maillart Bridge, Aarburg, Switzerland

Bespoke stainless steel AquaDeck units chosen as the drainage solution for the beautiful Maillart Bridge in Aarburg, Switzerland.
M4 River Taff Road and Rail Bridges

Sometimes a project just comes together and this was certainly the case with the M4 River Taff project we worked on with Alun Griffiths, installing 800m of AquaDeck.
Composite Access Solution for a Septic Tank

A customer got in touch recently wanting an opinion on the best solution to his garden problem – the stench leaking from a septic tank!
Lowestoft’s new Gull Wing Bridge Scheme

Over 1400 AquaDeck ductile iron combined kerb bridge drainage units will be installed on the iconic new Gull Wing Bridge in Lowestoft.
River Moy Bridge, County Sligo

Our recent success in Ireland continues with the order to supply an AquaDeck bridge drainage system on the new River Moy bridge, built by BAM Civils as part of their N26 Cloonguallane project.
M5 Golden Valley Interchange

We were recently approached by Kier/MJ Church who had an immediate requirement for bridge drainage units on their project along the M5 Golden Valley Interchange.